Why Technical Uncertainty Matters

Of everything in the research credit rules, uncertainty does the most work. It is what separates research from ordinary building. It is also the thing teams are worst at writing down, because by the time the work ships, the uncertainty is gone and nobody remembers how real it felt.

Three kinds

The regulations describe uncertainty as existing when the information available to the taxpayer does not establish one of three things (Treas. Reg. § 1.174-2(a)(1)):

  1. Capability. Can this be done at all? Can we get latency under the threshold on this hardware? Can the sensor resolve the feature at this distance?
  2. Method. We believe it can be done, but we do not know how. Which algorithm, which architecture, which manufacturing process?
  3. Appropriate design. We know it can be done and roughly how, but not the right design. How do the parts fit so that it meets the requirements together?

Any one of the three is enough. Most real projects carry more than one.

What uncertainty is not

  • Business uncertainty. Not knowing whether customers will buy it is a market question.
  • Schedule or budget uncertainty. Not knowing whether you can finish by March is a planning question.
  • Uncertainty a competent person could clear up by looking it up. If the answer is in the documentation, it was not uncertain. It was unread.

The test is about what was known and available to your team when the work began.

The hindsight problem

Ask an engineer about a solved problem and you will hear how obvious the answer was. "We just needed to move the cache in front of the service." They are describing the end of a three-week investigation as if it were the start.

This is the main reason records built after the fact are weak. People flatten the story. The dead ends disappear, and with them the evidence that there was something to figure out.

How to capture it

One paragraph, written at the start, is enough. It should say:

  • What we are trying to make work.
  • What we do not know: capability, method, or design.
  • Why the answer is not available to us already.
  • What we plan to try first.

Date it. Put it where the work lives: the ticket, the design document, the top of the pull request. That paragraph, written in the team’s own words before the answer was known, is worth more than a polished narrative assembled a year later.

A side effect worth having

Teams that state their uncertainty up front make better engineering decisions. Naming what you do not know forces a choice about what to test first. It makes the kill criteria visible. It keeps a team from spending a month building on an assumption nobody checked.

Good documentation and good engineering turn out to be the same habit.

The Doer of Things provides research and development services and related documentation support. We are not a tax advisor, CPA, or attorney. Eligibility for the federal R&D tax credit under Section 41 (including any payroll tax election under Section 41(h)) depends on the specific facts and circumstances of each company and must be determined by qualified tax professionals. We do not guarantee any tax credit amount or outcome. Companies should consult their own CPA, tax attorney, or other qualified advisors.

Next Building Software When the Solution Is Not Known

Tell us the hard part

Book a 30 minute call with The Doer of Things. Bring a rough list of what your team built or tried to build this year.

Book 30-minute discovery call